Outremer 59 5X Visits GIBY

This Outremer 59 5X travelled from Florida to Maine this summer to tackle several significant projects. During the visit, the new boat owner worked closely with the GIBY team to fine-tune the work scope. Doorway heights were raised to improve overhead clearances; sliding doors were hung to improve use of interior space; the bonding system was updated to eliminate stray current; new B&G electronics were installed at the nav station and helm; the solar array was upgraded; locker storage rods were fabricated and installed; the davits were repaired and painted Jet Black; new tender hoisting lines were spliced; the rig and steering systems were inspected; and an audio/video camera was installed to improve blind-spot views of in-water activity at the bow. The genset and heater were also serviced, while hatches were rebedded and cabinets and shelving were modified.