An Island Packet 380 has been moved into the GIBY Refit Bay where our team will tackle the boat’s winter punchlist. A custom arch by Cumberland Ironworks has already been lifted into place. The arch will accommodate a new solar panel installation, as well as an array of antennae, and a hydrovane. The dinghy davit bridle system will also be modified.
![](http://www.greatislandboatyard.com/wp-content/uploads/2020/01/EE41F08E-13DC-4E0C-92FA-313738FCD444-300x300.jpg)
![](http://www.greatislandboatyard.com/wp-content/uploads/2020/01/D1087F05-F9CB-4395-95B6-B1021BF130BB-300x300.jpg)
![](http://www.greatislandboatyard.com/wp-content/uploads/2020/01/4D4F1190-1818-4416-A8C0-BB74A65CC342-300x300.jpg)
Leave a Reply