Bobby is progressing on the custom refrigeration unit on the Hunt 36. Ducting for the air condenser has been installed and the unit has been fitted with cooler panels, a SeaFrost compressor, and an evaporator. Now that a drain hole has been located and all the systems have been connected to power and control cables, it’s time to complete the carpentry work. John H is fabricating the upper galley shelves and sliding doors, cutting and mounting the Formica countertops, milling the fiddles and trim, and installing drawers. It’s almost time to chill the champagne!