An Island Packet 380 has been moved into the GIBY Refit Bay where our team will tackle the boat’s winter punchlist. A custom arch by Cumberland Ironworks has already been lifted into place. The arch will accommodate a new solar panel installation, as well as an array of antennae, and a hydrovane. The dinghy davit bridle system will also be modified.



Leave a Reply